Messa in sicurezza

Attività di Messa In Sicurezza di Emergenza (MISE), attività di Messa In Sicurezza Operative (MISO) ed attività di Messa In Sicurezza Permanente (MISP) come previste dall’ Allegato 3, Parte IV, D.Lgs. 152/2006: “Criteri generali per la selezione e l’esecuzione degli interventi di bonifica e ripristino ambientale, di messa in sicurezza (d’urgenza, operativa o permanente), nonché per l’individuazione delle migliori tecniche d’intervento a costi sopportabili.”

 


 

  • Fortezza Landfill buried and reclaimed by Ecosurvey

    Reclaimed Landfill BBT

    The longest underground railway connection in the world, between Fortezza and Innsbruck: the Brenner Base Tunnel, with a buried landfill reclaimed with MISP from Ecosurvey. Approval from the Services Conference of the Province of Bolzano and VIA Committee of the Environment Ministry. In addition to significant environmental benefits, the approved MISP project allows savings of over € 3 million in public resources compared to the initial hypothesis envisaged by the customer.

  • Siti metalmeccanici e organoclorurati

    Multinational Mechanical Industry (Italy)

    Within the framework of a due diligence of acquisition, the characterization of the historical contamination status of four nationally-owned establishments with total surface area of approx. 25 ha. The main contaminants, compounds of the organochlorinated group, were found in groundwater and groundwater and safety activities were carried out, reclamation activities were planned and pilot and…

  • Reclamation of Chemical Deposits

    Characterization of the state of contamination of four deposits of national importance for a total extension of more than 11 ha. Realization of soil, subsoil, groundwater and waste quality control activities in compliance with Directive 96/82 / EC. Reclamation of chemical deposits by adopting Emergency and Operational Safety Measures by adopting the principles of green…

  • Fuel Sales Points (Italy)

    Examining the document compliance of the storage areas of approx. 100 sales outlets of Emilia Romagna and Lombardy. Examination of the subsoil quality by examining interstitial gases of approx. 250 sales outlets distributed across the country in three successive survey campaigns.

  • emissioni odorigene

    Odor Emissions (Italy)

    Residential areas that are getting closer to historical productive areas. Examination of the quality characteristics of the gaseous effluents of production plants by verifying the chemical and odorous properties released to fireplaces authorized in the framework of projects to mitigate the impacts of atmospheric emissions against sensitive targets. Modeling of diffusion plumes in the atmosphere…

  • Sugar Factories

    As part of the implementation of the EC Regulation 320/2006 of 20.02.2006 on the transitional regime for the restructuring of the sugar industry in the European Community, amending Regulation EC 1290/2005 of 21 June 2005 on the functioning of the “Ecosurvey® has followed the soil and groundwater aspects of 6 + 2 sugar factories of…

  • Incinerator (PN)

    Examination of the environmental impact of the emission of greenhouse gas emissions for the study of the Environmental White Paper carried out in agreement with the competent authorities. The examination has allowed to define the areas of maximum relapse and select top soil sampling areas to test the theoretical model of the dispersion of pollutants…

  • Portoscuso (CA)

    Characterization plan for the contamination status of the land, surface water and groundwater of the commune of Portoscuso (CA), ca. 1600 hectares, National Landmark Site (SIN) has allowed the quality control of the terrain of the respectable area between the residential area and the industrial area, and also the quality of groundwater quality has allowed…

  • ENI Refinery (TA)

    Refinery Characterization Plan ENI Div. R & M of Taranto, National Interest Site (SIN). Investigations have been extended to the entire area of the plant, approx. 275 ha. They were carried out approx. 1,000 characterization surveys, the creation of a monitoring network of approx. a hundred piezometers, the withdrawal of approx. 3,000 samples and the examination of approx. 30,000 analytical parameters. Within the SIN of Taranto was the first environmental characterization plan approved by the Ministry of the Environment RIBO service.

  • ex-Macero of Plain

    Clearing formerly plain plain The excavation of excavations associated with a construction project in the province of Bologna has found ground and groundwater with abnormal organoleptic characteristics up to the depth of approx. 2.5 m from p.c. Investigations highlighted the presence of an underground basin that housed plastered land for buried waste: an ex-macero. The…